Designed and built by James Holford
Built with Claude · © 2026
✦ v1.6  ·  Open Source  ·  Local-First

Release Management.
Reimagined.

Operational intelligence for Release Managers, Service Managers, Technical POs and Delivery Leads. From Go/No-Go to PIR sign-off — in one place.

ITIL 4 (current edition) DORA Metrics — Four Keys EU DORA — Digital Operational Resilience Act WCAG AA No signup · No server · Local-first
Click anywhere or wait to advance

Release day shouldn't feel like
controlled chaos.

But for most teams, it does. Here's why.

🗂
No single source of truth
Status in Jira, gates in email, defects in a spreadsheet, runbook in a Word doc nobody's updated.
✦ Solved: unified release record
🚦
Go/No-Go is undocumented
Decision happens in a Teams call. Someone says "looks good." No formal record. No audit trail.
✦ Solved: Go/No-Go wizard
📉
Wrong information to stakeholders
Directors need RAG. AEs need customer impact. Teams need blockers. Everyone gets the same wall of text.
✦ Solved: 5 audience reports
🌍
Deployment windows ignore reality
Quarter-end freeze, offshore unavailability, bank holidays across 3 countries — invisible until it's too late.
✦ Solved: blackout calendar
🔗
No traceability chain
The Jira story, ServiceNow CHG, Jira Align portfolio epic — three systems, no visible connection.
✦ Solved: golden thread
🔄
Every release starts from scratch
Same gates, same runbook, same risk structure — rebuilt from memory every single time.
✦ Solved: release templates

Every release. Live.

RAG status, readiness scores, upcoming gates, Hypercare monitoring — one dashboard.

Release Dashboard v1.6 · 3 active releases
Active Releases
0
in flight
Gates Due (14d)
0
upcoming
Blockers
0
open defects
Deploy Freq
DORA metric
Platform Release Q3
MAJOR · Cloud, API, Mobile
● GREEN
0
Mobile App v2.9
MINOR · Mobile
● AMBER
0
CWA Patch 24.x
PATCH · CWA, DI2
● RED
28
71:24:18
🟢 Hypercare Active
Platform Release Q3 · Monitoring
⬡ Release Readiness Score

One number.
The full story.

A 0–100 score per release, calculated live from four weighted factors. No more "how are we looking?" — the number tells you.

Gates complete — how far through the process
Defects — zero blockers scores 100, each one reduces it
Environments — health and promotion status
Sign-offs — formal gate approvals recorded
0
/ 100
Gates
0%
Defects
0%
Environments
0%
Sign-offs
0%

The moment that matters most.

5 structured steps. A formal, timestamped decision. Every time.

🚦 Go / No-Go Decision Wizard Step 1 of 5
⬡ Deterministic AI

Intelligence that fires
as you type.

17 pattern rules analyse your inputs in real time. Regulatory keywords, security vulnerabilities, authentication changes, database migrations — each triggers tailored, actionable guidance.

No external API  ·  No data sent anywhere  ·  Works offline
You type into the Release Name field:
⬡ INTELLIGENCE
Defect title analysed:
NullPointerException in PaymentProcessorService
CRITICAL BLOCKER ← auto-classified by AI

72 hours post go-live.
Structured. Not anxious.

Hypercare Mode keeps the team focused until All Clear is confirmed.

🟢 HYPERCARE ACTIVE — Platform Release Q3
71:23:44
Error rates within normal baseline
Performance metrics stable — p99 <200ms
No P1 incidents attributed to this release
Support team briefed on all changes
Monitoring dashboards green
All Clear Confirmed
Release closed · Jane Smith (Release Manager) · Platform Release Q3

Deployments don't happen
in a vacuum.

Six blackout period types — all visible on one calendar. Releases landing on blackout dates are flagged automatically.

Change / Release Freeze
Financial Reporting Period
Bank / Public Holiday
Offshore Team Unavailable
System Maintenance
Release Target
September 2026 Q3
Mon
Tue
Wed
Thu
Fri
Sat
Sun
⚠ Release target 15 Sep falls within financial reporting freeze period

12 tools. One place.

Watch an inbound Jira release trigger populate the tool in real time.

🟦Jira
🟪Jira Align
🟦Azure DevOps
🟩ServiceNow
GitHub
🟡Linear
💬Slack/Teams
📋Confluence
JS API
⚡ Live simulation — Jira release trigger
✓ Release imported from Jira
Q3 Platform Release 2026 · MAJOR
47 issues in scope · Target: 15 Sep 2026
→ Gates auto-generated · Planner pre-filled
✦ Open Source · Local-First · Zero Signup

Release Management.
Reimagined.

For Release Managers, Service Managers, Technical POs and Delivery Leads who need to coordinate delivery across complex environments — without the enterprise overhead.

Open the Tool → View Showcase ⭐ GitHub
James Holford
Senior Service Delivery & Technology Operations Leader
Actively upskilling · AI-assisted product development · © 2026
v1.6  ·  ITIL 4 (current edition)  ·  DORA Metrics  ·  EU DORA (Digital Operational Resilience Act)  ·  WCAG AA